After switch-on

The installer leaves, the inverter's light turns green, and the panels start making electricity. A few jobs in the first weeks, and a glance each month after that, keep it that way.

Sources checked on 3 November 2026. Written by SEO Dons, which sells and fits nothing.

The first fortnight

  1. Collect the papers. The MCS certificate, the electrical installation certificate, the network notification or approval, the inverter settings (including any export limit), datasheets, warranties and the workmanship warranty's insurance details.
  2. Set up the monitoring. Most inverters have an app. Connect it to your Wi-Fi and check that it shows today's output.
  3. Apply for an export tariff. Any licensed supplier offering one will need the MCS certificate and readings from a meter that records exports, usually a smart meter.
  4. Tell your home insurer. Panels become part of the building; most insurers simply want to know.

Reading the monitoring

Daily figures swing with the weather, so judge the system by the month. In Widnes a south-facing system makes roughly four times as much in May as in December. Compare each month with the same month last year; a clear drop with no obvious cause, such as a new tree or a dull summer, is worth raising with the installer. A completely flat line usually means the inverter has tripped or lost its connection to the app.

If there is an export limit

On a system approved with a cap, the monitoring may show output flattening at the limit on bright middays when the house is not using much. That is the limit working. If it happens often, using appliances at midday, adding a hot-water diverter or a battery will put that power to use. The export limits page shows how much it can cost.

Upkeep

  • Cleaning. Rain usually does it on tilted panels. If they need more, use a firm with water-fed poles; do not climb onto the roof.
  • Birds. Pigeons sometimes nest under panels. Mesh around the edges, fitted by the installer, stops it.
  • The inverter. Inverters usually wear out before panels do. Note the warranty's end date and budget for one replacement.
  • The roof. If roof work is ever needed under the panels, they will have to come off and go back; keep the installer's details.

Adding to the system later

A battery, more panels or a larger inverter added later is new work. The installer has to notify SP Energy Networks again, or apply first if the new total of inverters is over the limit, as G98 and G99 explains, and the MCS certificate for the original system does not cover the addition. Ask for a certificate and the network paperwork for the new work too, and keep them with the originals.

Selling a home with panels

A buyer's solicitor will usually ask about the panels. Keep the MCS certificate, the electrical certificate, the network notification or approval and the warranties with the deeds so they can be handed over. If the panels were fitted after the home's last energy certificate, a new one will show them; the old certificate will not.

If something goes wrong

Contact the installer first, in writing. If that fails, the consumer code the firm belongs to, RECC or HIES, has a complaints and dispute process. Keep a note of dates, readings and what was said.

Related pages

Sources for this page

  1. MCS MIS 3002 v6.0: the installation standard for solar PV
  2. SP Energy Networks, connections: small generation and how to notify or apply
  3. Ofgem: SEG export tariffs explained
  4. RECC: the Renewable Energy Consumer Code
  5. HIES: Home Insulation and Energy Systems consumer code
  6. PVGIS 5.3, European Commission Joint Research Centre: long-term yearly output for Widnes by tilt and direction

Questions after installation

What paperwork should I get after solar panels are fitted?

The MCS certificate, the electrical installation certificate, the G98 notification or G99 approval, the handover pack with datasheets and warranties, and the details of any insurance-backed workmanship warranty.

Do solar panels in Widnes need cleaning?

Rain usually keeps tilted panels clean enough. If yours are visibly dirty or output drops, use a specialist with water-fed poles rather than climbing on the roof, and check the panel maker's guidance first.

How do I know my system is working?

Watch the inverter's app or display. Eleven 440 W south-facing panels should make about 4,529 kWh over a year in Widnes; compare each month with the same month the year before rather than with the forecast for a single day.

A quote, an inverter or a connection question about your Widnes home?

Tell us what you are weighing up, with your Widnes postcode. The message goes to SEO-DONS LTD, which publishes this independent guide, and the answer comes back by email. Asking costs nothing and binds you to nothing.

What happens next

  1. Send the form; your postcode tells us which part of Widnes the roof is in.
  2. We read what you sent and reply by email with the figures and sources that apply.
  3. Whether you go ahead, and with which firm, stays your decision.